Abstract : It is very important that the decision makers really know the operation of the production line in time to make decisions, so that misunderstandings of not run and the problem persists. Here the case study was conducted in the. cattle slaughter house refrigerator located in the State of Mato Grosso (Brazil), which presented problems related to the production line imbalance, false bottlenecks and pointing accuracy of this imbalance on long drives. Thus by the study is possible to solve the problems through the application of the five steps of TOC, the organizing company with investments in ideal locations attacking the real problems and increasing productivity and managerial constraints.